M

DC-EC

District Cooling Engineering Console

From master plan to 25-year tariff, in one hourly model.

Trace the network on a map, size the plant, simulate all 8,760 hours of the year and solve the tariff that meets your target return. One physics engine sits behind every number.

Planning- and concept-level engineering. Results are internally consistent and auditable; they do not replace detailed design.

Sign in

To your plant models, hourly simulations and feasibility studies.

Five missions, one model

Start from the question you are paid to answer.

Master plan feasibility

Diversified demand from floor area, plot size, utilities and road corridors.

Design review

Is storage workable all year, and does annual kW/TR meet the target?

Expansion assessment

Can existing plants and pumps take the added load, and what is the cheapest fix?

Operational benchmark

Achievable kW/TR against actuals, and the controls that close the gap.

Concession appraisal

25-year cash flows and the tariff that meets the target equity return.

How it connects

Change one input and everything downstream updates.

1 · Network

Trace it, size it

Draw pipes and energy transfer stations; rings are detected, the governing station and pump head are found for you.

2 · Plant

Simulate every hour

Chiller staging, tower approach, storage dispatch and pump drives, hour by hour on local weather.

3 · Economics

Solve the tariff

Capex, operating cost and customer volume risk feed a financial model that solves for your target return.

Built to be checked

Every run audits itself.

Energy, flow and water balances are re-checked for each of the 8,760 hours, with the residuals shown. Rates live in one cost database, assumptions sit in one register, and reports carry a sign-off matrix.

Read the technical reference
ChargeDischargeChillersLoad0006121824

Illustrative day: storage charges off-peak and discharges across the peak.